Substation Extension & Reinforcement of Supply at Mambong 275/132/33kV Substation

The 5 Year Transmission Masterplan identified that the Kuching 132kV system will face bottlenecks due to rising load demand with the Mambong Substation being one of the key substations of concern. In 2021, the substation was operating at nearly 50% of its capacity and is projected to fail the N-1 supply reliability criteria by year 2023-2024. Therefore, reinforcement of this substation is essential to support the growing demand and ensure system reliability.

2024

Kemena 275kV Extension and Kemena 132kV Substation Project

The Sarawak Corridor of Renewable Energy ("SCORE") is aimed at developing the natural resources of Sarawak to provide the industrial base required for the economic development of the state and the creation of employment opportunities for its people. The SCORE is being developed by the Employer on behalf of the Government of Sarawak and includes the development and installation of Kemena 275kV Extension and Kemena 132kV Substation project.

2021

About Us

TransSystem Continental Sdn Bhd, established on 8th April 2009, specializes in electrical generation, transmission, distribution, and utilization.

The company business includes Civil and Electrical Engineering and General Contracting. In line with the Group vision Bringing Good Feel To Life, this is in line with Malaysia Madani, Malaysia government’s aspiration to improve the welfare and living standards of all people living in Malaysia. Hence, we are eager to contribute to the growing investment in electrical power sector.

Being a subsidiary of EITA Resources Bhd, a public listed company, we actively capitalise on the group’s financial strength and stability, we have been actively participating in EHV Transmission and Distribution Substations development projects in both Peninsular and Sabah & Sarawak.

Our Team

Our team comprises highly qualified engineers and technicians, most with over 20 years of hands-on experience in the field of electrical substation primary and secondary equipment range from LV to EHV (up to 500kV).

Our company is committed to provide continuous staff training to enhance their knowledge and ensure they are proficient in managing the new demands brought by technological advancements.

With our expertise and dedication, we ensure efficient project execution and confidently overcome any challenges.

Our Services

Local manufacturing of:

  • Protection relay and control panels for EHV transmission and distribution substations

  • Marshalling kiosks, metering panels, and related equipment to support primary substation operations

  • Mosaic control panels and generator protection panels for power stations

  • Microprocessor-based Substation Control System (SCS) and Substation Interrogation and Monitoring System (SIMS)

Supply installation, testing and commissioning of 11kV/ 33kV/ 132kV/ 275kV/ 500kV distribution substations for commercial building, factories, water treatment plants, DAM and electrical utilities.

Turnkey Transmission and Distribution Substation projects for private sector (steel mills, petrochemical plants) and the electric utilities (TNB, SESCO, SESB).

Transmission substation site retrofitting/ refurbishment and upgrading of existing substations.

Underground power cable laying, termination and jointing works.